Work on the refurbishment of the school campus started this summer with the demolition of the ‘New’ Games Hall, the Dance Studio and the Swimming Pool (above) while a temporary gymnasium (below) was erected in front of Camaghael Hostel. With the demolition site cleared before the school re-opened in August, we are expecting work to start on our new sports centre early in 2009.